Prototype. Every figure on this page is illustrative. The register holds 8 sample assets from the MoPED data-model workbook and 112 generated to match its schema — no real asset, valuation or coordinate.

Halted Production Plant — Haram

GIZ-IND-0069 · Giza

3 - Long term / complexVacantCondition: FairPublishedConfidence: Low

Halted Production Plant — Haram

59 Ramses Street, Haram, Giza, Giza

Industrial facility · Ministry of Public Business Sector

Cleanest disposal candidate in its governorate — ready title, no encumbrances.

Market value

⁦EGP 148.2m⁩

book value ⁦EGP 83.5m⁩

Value after renovation

⁦EGP 170.4m⁩

scope: Cosmetic / finishes only

CapEx

⁦EGP 10.7m⁩

over 4 months

Net operating income

⁦EGP 6m⁩

on ⁦EGP 8.6m⁩ gross revenue

Gross yield

⁦4.0%⁩

below the ⁦12%⁩ hurdle — sale candidate

Revenue gap

⁦EGP 6m⁩

against ⁦EGP 0⁩ earned today

Recommendation

Highest & best use

Logistics / warehousing

Monetization route

PPP concession

Payback

⁦1.8⁩yrs

Vacant

⁦4⁩yrs

Monthly rent equiv.

⁦EGP 713,575⁩

Assumed occupancy

⁦69%⁩

Blockers

  • Active litigation with former operator
  • No independent road access, easement to be negotiated

Location

Coordinates
⁦29.9912⁩, ⁦31.1922⁩
Main road / transport
⁦0.8⁩ / ⁦3.3⁩ km

Estimated valueSimulated

Back-cast from today's valuation at the Assumptions sheet's inflation rate plus governorate drift.

Condition scoreSimulated

Decay rate follows the recorded utilization status; the final point is today's rating.

A. Identification & Ownership

14
Asset IDasset_id
GIZ-IND-0069
Asset Name (EN)asset_name_en
Halted Production Plant — Haram
Asset Name (AR)asset_name_ar
مصنع متوقف عن الإنتاج — الهرم
Custodian Entitycustodian_entity
Ministry of Public Business Sector
Custodian Sub-Unit / Directoratecustodian_sub
Tourism Development Office
Ownership Typeownership_type
Public domain (أملاك عامة)
Title / Registration Statustitle_status
Disputed
Asset Classasset_class
Industrial facility (منشأة صناعية)
Current Usecurrent_use
Disused since the department merger
Utilization Statusutilization_status
Vacant (شاغر)
Years Vacant / Underusedvacancy_years
⁦4⁩
Occupied By / Encumbrancesoccupied_by
None

B. Location & Geospatial

14
Governorategovernorate
Giza
City / Markazcity
Giza
District / Neighbourhooddistrict
Haram
Full Address (EN)address_en
59 Ramses Street, Haram, Giza, Giza
Full Address (AR)address_ar
٥٩ شارع رمسيس، الهرم، الجيزة، الجيزة
Latitudelatitude
⁦29.991184⁩
Longitudelongitude
⁦31.192219⁩
Zoning Classificationzoning
Industrial
Permitted Use per Detailed Planpermitted_use
Logistics and light industry
Distance to Main Road (km)dist_main_road
⁦0.75⁩
Distance to Transport Node (km)dist_transport
⁦3.26⁩
Catchment Population (000s)catchment_pop
⁦EGP 344⁩

C. Physical Characteristics

11
Land Area (m2)land_area
⁦23,660 m²⁩
Built-Up Area / BUA (m2)bua
⁦3,810 m²⁩
Gross Leasable Area (m2)gla
⁦3,390 m²⁩
Number of Floorsfloors_count
⁦2⁩
Number of Unitsunits_count
⁦2⁩
Year Builtyear_built
⁦1,992⁩
Building Age (yrs)building_ageƒ
⁦34⁩
Structure Typestructure_type
Steel frame
Finishing Levelfinishing_level
Unfinished
Utilities Connectedutilities
Electricity, Water, Sewage
Heritage-Listed?heritage_listed
No

D. Internal Division & Layout

9
Internally Divided?has_internal_division
No
Number of Roomsrooms_count
⁦0⁩
Number of Bathroomsbathrooms_count
⁦3⁩
Reception / Hallsreception_count
⁦2⁩
Kitchenskitchens_count
⁦1⁩
Open-Plan Area (m2)open_plan_area
⁦3,100 m²⁩
Partition Flexibilitypartition_flexibility
Medium - some structural constraints
Parking Spacesparking_spaces
⁦58⁩
Layout Noteslayout_notes
Reception opens to a garden; bedrooms distributed across upper floors.

E. Condition & Renovation

9
Physical Conditioncondition_rating
Fair
Condition Notes (EN)condition_notes_en
Serviceable but dated; damp staining to lower floors and failing waterproofing.
Condition Notes (AR)condition_notes_ar
صالح للاستخدام لكنه قديم؛ آثار رطوبة بالأدوار السفلية وفشل في العزل.
Renovation Required?renovation_required
Yes
Renovation Scoperenovation_scope
Cosmetic / finishes only
Renovation Cost (EGP/m2)reno_cost_sqm
⁦2,800 m²⁩
Est. Renovation Cost (EGP)reno_cost_totalƒ
⁦EGP 10,668,000⁩
Renovation Duration (months)reno_duration_months
⁦4⁩
Licensing / Compliance Statuscompliance_status
Fully licensed

F. Valuation

8
Valuation Methodvaluation_method
Income capitalization (الدخل)
Land Value (EGP/m2)land_value_sqm
⁦EGP 5,700⁩
Building Value (EGP/m2)building_value_sqm
⁦EGP 3,500⁩
Est. Market Value (EGP)market_valueƒ
⁦EGP 148,197,000⁩
Value After Renovation (EGP)value_post_renoƒ
⁦EGP 170,426,550⁩
Government Book Value (EGP)book_value
⁦EGP 83,500,000⁩
Valuation Datevaluation_date
⁦27 Aug 2026⁩
Valuation Sourcevaluation_source
Entlaq desk review + 3 comparables

G. Income & Rental Potential

11
ADR - Residential (EGP/day)adr_residential
⁦EGP 0⁩
ADR - Commercial / Retail (EGP/day)adr_commercial
⁦EGP 34,000⁩
ADR - Office (EGP/day)adr_office
⁦EGP 0⁩
ADR Applied (EGP/day)adr_applicableƒ
⁦EGP 34,000⁩
Assumed Occupancy Rateoccupancy_rate
⁦69.0%⁩
Gross Annual Revenue (EGP)gross_annual_revenueƒ
⁦EGP 8,562,900⁩
Monthly Rent Equivalent (EGP)monthly_rent_equivƒ
⁦EGP 713,575⁩
Annual Operating Cost (EGP)annual_opex
⁦EGP 2,568,870⁩
Net Operating Income (EGP)noiƒ
⁦EGP 5,994,030⁩
Gross Yield (%)gross_yieldƒ
⁦4.0%⁩
Renovation Payback (yrs)reno_payback_yearsƒ
⁦1.78⁩

H. Utilization Gap & Monetization

7
Current Actual Income (EGP/yr)current_annual_income
⁦EGP 0⁩
Annual Revenue Gap (EGP)revenue_gapƒ
⁦EGP 5,994,030⁩
Highest & Best Usehighest_best_use
Logistics / warehousing
Recommended Monetization Routemonetization_option
PPP concession (شراكة)
CapEx to Activate (EGP)capex_to_activateƒ
⁦EGP 10,668,000⁩
Priority Tierpriority_tier
3 - Long term / complex
Key Blockersblockers
Active litigation with former operator; No independent road access, easement to be negotiated

I. Media & Documentation

6
Number of Photosphotos_count
23
Floor Plan / Survey (URL)floorplan_link
https://drive.example.org/assets/GIZ-IND-0069/plan.pdf

J. Data Governance

7
Primary Data Sourcedata_source
Field survey
Data Confidenceconfidence_level
Low
Site Visit Datesite_visit_date
⁦13 Aug 2024⁩
Surveyor / Analystsurveyor
Field Team D
Last Updatedlast_updated
⁦13 Sept 2026⁩
Record Statusrecord_status
Published
General Notesnotes
Cleanest disposal candidate in its governorate — ready title, no encumbrances.

23 photographs on file

The survey's geotagged photographs live in the custodian's drive folder. This prototype records the link and the count rather than shipping the images.

https://drive.example.org/assets/GIZ-IND-0069/photos

Source: Field survey. Surveyed by Field Team D on ⁦13 Aug 2024⁩. Record last updated ⁦13 Sept 2026⁩.